Utility Case Studies
PowerClerk
Streamlining solar interconnection: How JEA leveraged PowerClerk® to resolve its backlog
Automation and streamlined program management empower the JEA energy programs team to scale their solar interconnection program and address a 9-week backlog of project approvals. JEA, Northeast Florida's not-for-profit community-owned utility, was faced with manually...
APS utilizes PowerClerk® to enable efficient, flexible FERC generator interconnection management
Automation and consolidation empower the Arizona Public Service FERC Generator Interconnection team to scale and operate with confidence, knowledge and power Arizona Public Service’s FERC Interconnection team was faced with growing application volume, which strained...
Rappahannock Electric Co-op (REC) streamlines solar processes
WattPlan® and PowerClerk® automate solar education and accelerate interconnection timelines Rappahannock (REC) needed to address multiple interconnection challenges, including high solar support call volumes, a labor-intensive interconnection process and a manual...
O&R streamlines EV make-ready program with PowerClerk
Accelerating O&R’s POWERREADY EV infrastructure program in New York state New York State and O&R have established ambitious goals to scale the deployment of electric vehicle infrastructure. O&R needed to improve its EV make-ready program application and...
PowerClerk Analytics
Exelon Companies Gain PV Generation Insights with SolarAnywhere FleetView
FleetView calculates behind-the-meter PV generation to inform gross load calculations and distribution planning. Three Exelon companies (Atlantic City Electric, Delmarva Power and Pepco), experienced accelerated growth of residential solar installations in their...
Eversource decarbonizing Massachusetts’ grid with intelligent, long-term planning
Using data and advanced modeling to predict future DER adoption and distribution grid impacts. As consumers and businesses accelerate their adoption of DERs — such as photovoltaics, electric vehicle charging infrastructure and battery storage systems — Eversource...
Clean Power Research and Integral Analytics partner to help utilities optimize distribution network investments
New solution addresses key DER information gaps and equips utility planners with the information needed to gain critical DER insights for distribution system planning Napa, CA. January 31, 2023. Clean Power Research® and Integral Analytics, a Willdan company, today...
Inferring PV system specifications from net loads and reconstructing gross loads
The US Energy Information Administration (EIA) estimates that residential PV systems accounted for 61 percent of total annual generation from small scale distributed PV systems in 2021. The amount of power coming from these Behind-The-Meter (BTM) PV systems emphasizes...
Virtual Energy Audit with Sacramento Municipal Utility District
Evaluating Building Performance of Single-Family Homes in SMUD’s Service Territory Clean Power Research has developed the Virtual Energy Audit (VEA) to address some of the building electrification challenges that consumers and utilities will encounter. The VEA...
Inferring PV system specifications from net load
The increasing penetration of grid-connected solar photovoltaics has challenged the existing method of planning and operating the distribution grid. Electric utilities require visibility into the PV installations within their territories and are interested in knowing...
WattPlan
Rappahannock Electric Co-op (REC) streamlines solar processes
WattPlan® and PowerClerk® automate solar education and accelerate interconnection timelines Rappahannock (REC) needed to address multiple interconnection challenges, including high solar support call volumes, a labor-intensive interconnection process and a manual...
Tucson Electric Power builds a better customer experience with WattPlan®
https://www.cleanpower.com/2020/tep-builds-a-better-customer-experience-wattplan-advisor/
ENE drives EV awareness with WattPlan®
https://go.cleanpower.com/rs/369-HBZ-605/images/ENE_evAPP_Case-Study_FINAL_082521.pdf